Project Description: Worldgate 7th Floor Renovation
Client: Navy Federal Credit Union (NFCU)
            Herndon, Virginia
Facts:
- Size: 21,000 square feet
- Project Type: Interior Tenant Fit-Out
- Construction Cost: $500,000
- Architect: J3 Design Collective
- Contractor: Davis Construction
- Services Provided: Mechanical, Electrical & Plumbing Engineering Design; Construction Documents; Construction Administration
Features:
- Primarily open office layout consisting of systems furniture
- HVAC system providing increased amounts of outside air ventilation to comply with current code and local jurisdiction requirements
- Perimeter fan-powered VAV terminal units for proper ventilation & zone temperature control
- Interior shutoff VAV terminal units for proper ventilation & zone temperature control
Williams Notaro was contracted by Navy Federal Credit Union to design the interior tenant fit-out of the entire 7th floor of the Worldgate building in Herndon, Virginia. The existing base building HVAC system and lighting system design was completed to provide a complete open office environment for future NFCU expansion.