Project Description:  Item Processing Office and Mail Handling Room
Client: 
Pentagon Federal Credit Union (PFCU)
            Kingstowne and Chantilly, Virginia
Kingstowne Facts:
- Size: 900 square feet
- Project Type: Item Processing Relocation
- Architect: Fanelli McClain
- Services Provided: Mechanical, Electrical, & Plumbing Engineering Design; Construction Documents; Bid Review; Construction Management; Construction Administration
Chantilly Facts:
- Size: 700 square feet
- Project Type: Mail Handling Relocation
Facts (both locations):
- Architect: BPA Associates
- Services Provided: Mechanical & Electrical Engineering Design; Construction Documents; Construction Administration
Kingstown Features:
- Relocate item processing office from Alexandria headquarters
- UPS and emergency generator back up power on all equipment
- Utilize existing available services for the relocation design
Chantilly Features:
- Relocate mail handling room from Kingstowne location
- Raised floor data center
- UPS and emergency generator back up on all equipment
- Specific temprature and humidity requrements
Pentagon Federal Credit Union (PFCU) needed to move the Item Processing office from the Alexandria Headquarters to the Kingstowne facility. Before this move was possible, PFCU had to create space for the incoming item processing equipment by moving Kingstowne’s existing Mail Handling room to the Chantilly facility.
To meet crucial deadlines, Williams Notaro designed both relocations simultaneously. During the design phase, Williams Notaro evaluated both factilities’ existing electrical, UPS, generator, and HVAC capacities to assure that the facilities could accommodate the equipment relocation.