Project Description:  Reston Data Center

Client:  TRW
            Reston, Virginia

Facts:
  • Size: 1,800 square feet
  • Project Type: Mission Critical Systems Upgrade
  • Construction Cost: $175,000
  • Contractor: The HBW Group
  • Architect: Fanelli McClain
  • Services Provided: Mechanical & Electrical Engineering Evaluations; Construction Documents; Bid Review; Construction Administration
Features:
  • A thorough analysis provided TRW with viable options to add air conditioning capacity & standby power
  • Additional 10 tons of cooling capacity
  • New 350 KW diesel powered standby power generator
  • 600 ampere high voltage distribution system
  • New automatic transfer switch & associated sequencing
  • 30 kVA of low voltage equipment power
  • All modifications were performed without any disruption to operation of this mission critical facility
  • Coordination with the Reston Architectural Review Board for approval
Williams Notaro assisted TRW in evaluating and designing the upgrade of the Mechanical and Electrical systems in this mission critical data center. We closely coordinated with equipment manufacturers to precisely select and layout the equipment due to limited space in the service yard and in the building. The data center now features redundant mechanical and electrical systems and can continue to operate normally with a loss of utility power of more than 24 hours.